Iranian Tomato Paste · Export
Home › Buy Tomato Paste from Iran
From the first enquiry to receiving inspection — the twelve stages an international buyer moves through when importing Iranian tomato paste.
Overview
Buying tomato paste from Iran is a sequence of decisions, and each one constrains the next. A specification written carelessly produces quotations that cannot be compared; a sample approved in isolation produces a contract that disappoints. The buyers who avoid problems are the ones who move through the process in order.
This guide walks through the twelve stages in order, from defining your requirement to inspecting what actually arrives, and closes with a checklist, the mistakes that recur most often, and ways to reduce procurement risk.

Following the sequence reduces surprises. Most costly problems trace back to a stage that was skipped or compressed.
Agree Brix, consistency, colour, packaging and volume in writing before you request any price.
Shortlist producers that can hold your specification and reliably ship to your destination.
Ask for itemised FOB, CFR or CIF offers built on identical terms so they can be compared.
Test Brix, consistency, colour and taste against your own reference product, not a photo.
Check Brix, acidity, colour, viscosity and microbiological limits against your market's regulation.
Settle Incoterm, tolerance, payment method and the validity period of the offer.
Fix the format, fill weight, artwork and minimum print run before the order is placed.
Attach the specification by reference and agree inspection, claim window and remedy.
Review batch tests and sampling, and arrange third-party inspection where required.
Invoice, packing list, bill of lading, certificate of origin, health certificate, analysis.
Book the container, confirm the loading plan and confirm delivery terms and named port.
Check the container, net weight and quality on arrival and retain reference samples.
Before you commit, confirm each of the following:
✓ Specification written down and attached to the contract
✓ Lot-level certificate of analysis requested
✓ Incoterm and named port stated
✓ Packaging format and net-weight tolerance agreed
✓ Payment method and offer validity confirmed
✓ Inspection arrangement and personnel agreed
✓ Full export document list verified
✓ Claim window and remedy defined
Comparing headline prices. Convert every offer to cost per kilogram of solids; a higher-Brix lot can be the cheaper option.
Accepting a generic spec sheet. Ask for the lot certificate of analysis rather than the brochure figure.
Ignoring consistency. Two lots at the same Brix can behave very differently in your line.
Loose packaging terms. Agree format, fill weight and tolerance in writing.
No claim window. Fix a short, workable period to notify and inspect after arrival.
Underestimating documentation. Confirm the full document set with your broker and bank in advance.
Typically one 20-foot container; mixed grades within a single container are often possible for first orders.
FOB gives the most control of freight; CFR and CIF simplify logistics. Always name the precise port and the Incoterms version.
Divide the landed price by the solids content to reach a cost per kilogram of solids, then compare that figure.
Batch tests are normally issued by the producer; a third-party pre-shipment inspection can be arranged where your buyer or bank requires it.
Send your grade, packaging, volume and destination, and our export desk will respond with a documented, specification-based offer.